Nip and tuck: Orama

Architect

  • Smart Design Studio
    Sydney, NSW, Australia

Project Team

  • William Smart, Lucy Bedbrook, Anita Panov

Consultants

  • Builder AEA Constructions
  • Concrete Masterform
  • Engineer Istruct Consulting Engineers
  • Landscape designer Dangar Group

Site details

  • Location Sydney,  NSW,  Australia
  • Site area 719 m2
  • Building area 404 m2
  • Category Residential buildings
  • Type Alts and adds, Houses, Residential

Project Details

  • Status Built
  • Design, documentation 6 months
  • Construction 15 months

More projects